Merlin Polyurethanes

How We Work

merlin mouldings3

Here at Merlin polyurethanes we understand the pressures that our clients have with time restraints and important deadlines that must be met, with this in mind we are able to offer our clients a quick turn around with samples available from concept to prototype within 7 days

Our Process

Samples & Prototypes

Step 1
We will need drawings or Master Pattern?

Step 2
We make the resin tools and cast

Step 3
We Mould the Samples (if required various samples can be made in different density polyurethane)

Step 4
Samples are delivered to the Client
(7 days)

Production

Step 1
Signed approval that samples are OK for mass production

Step 2
Produce production tools. These can be made from Drawings, the Sample tools or CAD Data.

Step 3
Production of the order as specified by the client

Step 4
The order is trimmed and inspected (currently working to ISO 9000)

Step 5
The order is packed and despatched to our client